Connect with us

Headlines

Trezevant Realty Announces Exciting Upgrades at Parkway Centre

Published

on

 
unnamed Trezevant Reality is commercially developing a new subdivision extension — part of Parkway Centre — that has already set aside lots for business residents, including spaces sold for an eye clinic, insurance facility and dental practice.
Construction will begin in January on the buildings located on the North side of the project where Eric Randle, Joel Bell and Andrew Ross will operate their respective businesses, located in buildings 1,2 and 3 at the north end of the artist’s rendition above. Grand openings should follow six to seven months later.
Parkway Centre is located just south of Anderson Road and east of West Oxford Loop.
Trezevant Realty handled the marketing, design and layout in partnership with Strawhat Properties, LLC. Oxford Loop Properties, LLC is the developer.
Parkway Centre buildings  A,B, G and H are completed and fully leased.
“The southern most driveway will be utilized to gain access to the new shopping center call Oxford Galleria II, previously announced by your e-publication, said John Trezevant, owner of Trezevant Reality. “We’re designing some smaller freestanding office buildings to meet the demands for businesses desiring  to own or lease  their buildings and to have a duplex adjoining them for investment and future expansion. Straw Hat Contractors  is handling the building construction and ArchitectWong International is the architect.”
Trezevant adds that his company’s development projects have experienced tremendous growth, adding dental, medical supplies, eye care, insurance, pharmaceutical  sales, investment, anesthesia, rehab, plastic surgery,  family medical,  real estate, psychology and psychiatry offices. When fully built out, the project will consist of 100,000 square feet of professional workplaces. By Spring 2016, the growth in the immediate trade area will include a million square feet of retail, dining, hospitality, office and entertainment with a mix of national and local enterprises.

unnamed-16

In this artist’s rendition, the bottom nine buildings are in stages of  design and approval. Two are leased and construction on these will start January. The top four buildings are complete and occupied. North of them is the McCurdy property where Ross, Randell and Bell are building.


 
 
 

2024 Ole Miss Football

Sat, Aug 31vs Furman W, 76-0
Sat, Sep 7vs Middle Tennessee3:15 PM
Sat, Sep 14@ Wake Forest5:30 PM
CW Network
Sat, Sep 21vs Georgia Southern6:45 PM
Sat, Sep 28vs Kentucky11:00 AM
TBD
Sat, Oct 5@ South CarolinaTBD
Sat, Oct 12vs LSUTBD
Sat, Oct 26vs OklahomaTBD
Sat, Nov 2@ ArkansasTBD
Sat, Nov 16vs GeorgiaTBD
Sat, Nov 23@ Florida11:00 AM
Sat, Nov 30vs Mississippi State2:30 PM

@ COPYRIGHT 2024 BY NEW MEDIA LABS LLC. ALL RIGHTS RESERVED. HOTTYTODDY.COM IS AN INDEPENT DIGITAL ENTITY NOT AFFILIATED WITH THE UNIVERSITY OF MISSISSIPPI.

HottyToddy.com Covers Ole Miss Sports, Oxford Entertainment, Dining & More